Login
Subscribe
Now
Reprints/Licensing
100+ Years of Aviation Week
1916-Present
In Partnership With
Boeing
Aviation Week Network
Browse Issues
Boeing Features
Search
Getting Results...
Articles
163
View Articles
January 5, 1970
P. 81, 82
Air Transport
Joint 2707 Work Statements Developing
December 16, 1968
P. 60, 61
Aeronautical Engineering
Analysis Of 19 Configurations Preceded 2707-300 Design
December 16, 1968
P. 45 (6 Pages)
Aeronautical Engineering
Subsystems Carried Over To 2707-300
By
C. M. Plattner
December 9, 1968
P. 22
Special Report: Boeing SST Details
Boeing 2707-300 Production Model Data
July 24, 1967
P. 30
Air Transport
Second-round Orders Surge For Boeing 2707
May 19, 1969
P. 79 (3 Pages)
Aeronautical Engineering
Experts Struggled To Control 2707 Weight
By
Richard G. O'Lone
August 7, 1967
P. 31
Air Transport
Sst Technical Group To Include Non-u.s. Airlines Ordering 2707
January 5, 1970
P. 26 (3 Pages)
Air Transport
Reprograming Bolsters 2707 Effort In Overcoming Early Difficulties
By
Laurence Doty
December 25,1967
P. 28
Air Transport
Subcontracts On Sst And 747 Keynote Aerojet Diversification
Ads
61
View Ads
June 8, 1981
P. 394
Company:
Lockheed Electronics
AUGUST 17, 1953
P. 279
Company:
Airwork CORPORATION
SEPTEMBER 8, 1986
P. 93
Company:
TECHNOLOGY CORPORATION
September 8, 1969
P. 75
Company:
TOWNSEND COMPANY
SEPTEMBER 3, 1990
P. 82
Company:
MICROTURBO, INC.
JUNE 9, 1986
P. 79
Company:
TECHNOLOGY CORPORATION
July 13, 1981
P. 12
Company:
Lockheed Electronics
October 25, 1965
P. 206
JULY 9, 1990
P. 8
Company:
MICROTURBO, INC
December 8, 1969
P. 30
Company:
TOWNSEND COMPANY
March 8, 1971
P. 51
Company:
LITTON INDUSTRIES
March 9, 1970
P. 163
Company:
A Textron COMPANY
Images
78
View Images
January 5, 1970
P. 81, 82
Distribution of total program dollars, in thousands, to suppliers and subcontractors for the supersonic transport is shown on map. Prime contractors are excluded.
January 5, 1970
P. 81, 82
Major subcontractor selection for prototype Boeing 2707 is completed except for landing gear.
December 16, 1968
P. 45 (6 Pages)
Vented spoiler system is shown in wing cross section. Spoiler on top of wing, which rises to 60 deg., is linked with lower flap, which opens to form a scoop to divert airflow over trailing portion of wing. This improves control efficiency 50%.
December 16, 1968
P. 45 (6 Pages)
Body lengths and cabin configurations considered by Boeing for its supersonic transport include those shown above.
December 16, 1968
P. 45 (6 Pages)
Environmental control system planned for the Boeing supersonic transport is illustrated in drawing.
December 16, 1968
P. 45 (6 Pages)
Boundary layer scoops are visible in bleed air system diagram of supersonic transport inlet.
December 16, 1968
P. 45 (6 Pages)
Landing gear design for the Boeing supersonic transport incorporates components of stainless steel and titanium alloy. Its 40 x 14 tires are mounted on 20-in. rims.
December 16, 1968
P. 45 (6 Pages)
Sensors aligned on holders resemble rakes (above) on 1/10th scale model of Boeing supersonic transport inlet test model.
December 16, 1968
P. 45 (6 Pages)
Arrangement of mechanical, electrical and hydraulic portions of supersonic transport’s lateral control system are illustrated.
December 16, 1968
P. 45 (6 Pages)
Scoops are visible as rings around centerbody in 1/18th scale model. Collar of spikes at aft of centerbody generates vortices.
December 16, 1968
P. 45 (6 Pages)
Model of Boeing 2707-300 supersonic transport illustrates the aircraft with high-lift devices and nose in lowered configuration.
December 16, 1968
P. 60, 61
Supersonic transport pilots' main instrument panel has two electronic attitude director indicators (EADI). Each is at top of second grouping in from outside.
May 19, 1969
P. 79 (3 Pages)
Fourth Production C-5A Evaluating Avionics Equipment Fourth Air Force/Lockheed C-5A transport off production line flies toward flight test area near Marietta, Ga., to evaluate all of aircraft’s avionics equipment. During early flights, Lockheed-Georgia Co. crews conducted noise-level and sonic-fatigue tests. Aircraft had completed 26 flights up to last week, accumulating 87 hr. 20 min. in the air.
January 5, 1970
P. 26 (3 Pages)
Latest master schedule for Boeing 2707 calls for first flight of the prototype in 1972 and production deliveries beginning in 1978. Total costs of program phases through production peak financing are shown.
January 5, 1970
P. 26 (3 Pages)
Planform drawings compare configurations of U.S., Anglo-French and Soviet supersonic transports.
January 5, 1970
P. 26 (3 Pages)
Class 2 aluminum mockup of the Boeing 2707-300 is under construction (left) at the Boeing Developmental Center, where the prototypes will be built Wooden mockup for interiors and systems are under construction in background.
Aviation Week and Space Technology
Every Issue. Ever.
100 Years of Aviation Week — at your fingertips.
Subscribe Now
Already a subscriber? |
Login
Aviation Week
1
Article Title
Article Title
Article Title
Continue on pg.
129
From the
DECEMBER 1975
Issue
DECEMBER 1975
Read
Plain Text
Read Text
Read
Plain Text
Read Text
Article One
Article Two
Article Three
I'm
Done Reading
Done Reading
Done Reading
Page Details
{{ coverDate }},
By
By
Mert Alas; Marcus Piggott
Pictured:
Close
Page Details