News Sidelights
Engineers are expecting one of the most protracted wrangles in design room history when the Air Force-CABCAA prototype transport technical committee get down to the enervating job of actually preparing detail specifications. With wartime design conferences between airframe and contractor engineers still fresh in their minds, technical observers are standing by for negotiations to stretch into months and perhaps a year before a firm contract specification is actually circulated.