January 11, 1982

Editorial

Changing the Rules

Missile Engineering

Pentagon Drops Superhardened Silo Basing

Missile Engineering

MX Missile Milestones Completed Successfully

1415
Editorial

Changing the Rules

Commonality in federal procurement regulations is gaining the same sort of currency commonality in aircraft did a few years ago. Both have the attractions of an ideal system for a world that is far from ideal. Congress is interested in the establishment of a uniform federal procurement system and mandated in Public Law 96-83, enacted in 1979, that the Office of Federal Procurement Policy develop a proposal for one as its first priority.

2021
Missile Engineering

Pentagon Drops Superhardened Silo Basing

Deployment of 40 MX ICBMs in Minuteman fields selected as interim measure; ABM deployment to receive emphasis

2223
Missile Engineering

MX Missile Milestones Completed Successfully

Los Angeles—Development of the MX intercontinental ballistic missile and MX test facilities at Vandenberg AFB, Calif., is gaining momentum with completion of several program milestones in preparation for the scheduled start of flight tests for the advanced ICBM in one year.

2223
Missile Engineering

Defense Dept Raises Priority On Air Defense

Washington—The Defense Dept, considers the survivability and endurance of a U. S. bomber force a higher priority than modernizing the intercontinental ballistic missile leg of the strategic force triad, and Pentagon officials are moving toward an air defense system of the continental U. S. using interceptor aircraft and surface-toair missiles.
2425
Missile Engineering

Support Gains for MX Basing at Many Facilities

2425
Management

Administration Plans Authorizing $300 Million More for Israel

2425

Navstar Launch Date

Los Angeles—Navstar global positioning system program officials are considering the possibility of launching the next satellite earlier than scheduled as a result of the loss of Navstar 7 last month during a launch failure. The next satellite in the global positioning system series of spacecraft was scheduled to be launched in September.
2627
Management

Modifications to HH-65A To Counter Weight Boost

2627
Missile Engineering

Soviets Test New, Improved SLBMs

2627
Management

Egypt Buying Mirage 2000 Fighters

January 41982 January 181982