September 4, 2023

CARGO

FREIGHTER FACTOR

DEFENSE

BLENDED BREAKTHROUGH

TECH TAKE

TECH TAKE

4445
CARGO

FREIGHTER FACTOR

> MEDIUM WIDEBODY FREIGHTER FUTURE FOR AIRBUS AND BOEING IS IN FLUX > MIDSIZE WIDEBODIES ARE THE SWEET SPOT > AIRBUS EYES GREATER NEW-FREIGHTER MARKET SHARE

2627
DEFENSE

BLENDED BREAKTHROUGH

> BUILDUP BEGINS FOR U.S. AIR FORCE BLENDED WING BODY DEMONSTRATOR > FIRST FLIGHT TARGETED FOR 2027 > PW1100G GEARED TURBOFANS TO POWER THE BWB

6263
TECH TAKE

TECH TAKE

EU Team Actively Suppresses Flutter A European research team has demonstrated the suppression of wing flutter in flight using an active control system, potentially paving the way for lighter, more flexible and efficient wings for aircraft.

5657
PROPULSION

ZeroAvia Shifts Hydrogen-Electric Demonstration Focus to Larger Regionals

> 600-KW ZA600 HEADS TOWARD CERTIFICATION > FLIGHT DEMO PLANNED FOR 2-MEGAWATT ZA2000

3031
DEFENSE

NUCLEAR OPTIONS

> GAO BLASTS ACCURACY OF U.S. AIR FORCE SENTINEL SCHEDULE > THE SERVICE FACES A LAND-USE STRUGGLE IN UPDATING SILOS > CONGRESS AND THE WHITE HOUSE DISAGREE ON NEW SUBMARINE-LAUNCHED MISSILE

3233
DEFENSE

Could a Dark Horse Win the Next U.S. 'Doomsday Plane' Contract?

> SIERRA NEVADA CORP. IS CONSTRUCTING A MASSIVE MAINTENANCE, REPAIR AND OVERHAUL COMPLEX IN OHIO > E-4B REPLACEMENT LIKELY TO COME FROM USED 747 MARKET

1415
DEFENSE

SKUNKS WORK

> SECRET PRODUCTION ACTIVITY RESUMES INSIDE LOCKHEED MARTIN SKUNK WORKS FACILITY > HEADCOUNT TODAY RIVALS THE SR-71 ERA > LOCKHEED IS ALSO EYEING FUTURE HYPERSONIC AND MOBILITY WORK

1617
DEFENSE

U.S. Air Force Revives B-52 Jammer Proposal for China Threat

> MIDBAND ALQ-249 JAMMING POD COMES OFF THE SHELF > PRECISE DATE OF DEMONSTRATION HAS NOT BEEN DECIDED

4849
SPACE

India Aces Lunar Landing After Russia's Mission Crashes Into Moon

> JAPAN TO MAKE NEXT LANDING ATTEMPT > TWO COMMERCIALLY DEVELOPED U.S. LANDERS TO FOLLOW

4041
SUSTAINABILITY

Eurocontrol Says the Quest for a Greener Widebody Is in Vain

> SPIRALING AIRCRAFT WEIGHT MAKES MANY OPTIONS UNVIABLE > SUSTAINABLE POWER REQUIREMENTS ARE IMPRACTICAL

AUGUST 14-SEPTEMBER 32023 SEPTEMBER 18-OCTOBER 12023